Manufacturing on demand: send a drawing, get five comparable job-work quotes
Most of what we have sourced so far already existed somewhere: cartons, fasteners, diaries, chemicals. You described it, we found who sells it.
A lot of buying doesn't work like that. You have a bracket, a flange, a fabricated frame or a casting that exists only as a drawing, and what you need is a shop that will make it. In India this is called job work, and finding a good job-work shop is harder than finding a supplier, because the shop's machines matter as much as its price.
So the requirement form now has two modes: Find a supplier and Get it made. Here is what changed and how to get the most out of it.
What "Get it made" does
Switch the form to Get it made and it asks for the things a shop needs to quote:
- The process. CNC machining, sheet metal and laser cutting, welding and fabrication, casting, plastic and rubber moulding, 3D printing and prototypes, or something else. Tick more than one if the part needs it, such as laser cut, then bent, then welded.
- The material. The grade, not just the type: SS304 rather than "steel".
- The quantity type. A prototype (1 to 10 pieces), a small batch (tens to hundreds) or production (thousands, or repeat orders). Shops price these very differently, and some won't touch one or the other.
- The drawing. Up to five files, 20MB each.
None of it is compulsory. If all you have is a sentence and a photo, send that. We'll ask about the rest.
What to attach
A shop can only quote what it can read. In order of preference:
- STEP or IGES for a 3D part. Every CAM package opens them, whatever CAD you drew it in.
- DXF or DWG for flat profiles: anything laser cut, punched or bent from sheet.
- A dimensioned PDF. Perfectly good for most turned and milled parts.
- A clear photo of a hand sketch with the dimensions written on. For simple parts this is how a lot of small buyers work, and it is fine.
Then add the details that change the price: which tolerances actually matter (only the critical ones, since tight tolerances everywhere cost money you probably don't need to spend), the finish (zinc plating, powder coat, anodising or as-machined), and a real date.
Your drawing stays private
A drawing is your design, and leaking it to a competitor or to the shop next door is a real risk. So drawings are not stored on a public link. They go to a private store that only our sourcing desk can open, and a drawing is shared only with the shops we shortlist to quote that particular part. It is never posted on a public requirements feed. The requirement itself is never listed publicly either.
Why setup and piece price are shown separately
This is the most useful thing in a job-work comparison, and the one most quotes hide.
Every job has a one-time cost before the first good part comes off the machine: programming, fixtures, dies, a pattern for a casting. Some shops quote it separately. Others fold it into the piece price. Others leave it out and add it to the invoice. Put those side by side and the cheapest-looking quote is often the dearest order.
A worked example, for 50 machined flanges:
| Piece price | Setup | Total for 50 | |
|---|---|---|---|
| Shop A | ₹310 | ₹4,000 | ₹19,500 |
| Shop B | ₹270 | ₹9,000 | ₹22,500 |
Shop B looks cheaper per piece and costs ₹3,000 more. Now order 500:
| Piece price | Setup | Total for 500 | |
|---|---|---|---|
| Shop A | ₹310 | ₹4,000 | ₹1,59,000 |
| Shop B | ₹270 | ₹9,000 | ₹1,44,000 |
Now Shop B is ₹15,000 cheaper. Neither shop is wrong. They have different machines and different ways of working, and which one is right depends on your quantity and whether the job repeats. You can only see that if the two numbers are kept apart, so every job-work quote we send you has them separated, along with lead time and payment terms.
Up to five quotes now, not three
We used to aim for two or three quotes per requirement. We now aim for up to five, for job work and for ordinary sourcing alike.
Three is enough when you're buying something standard and prices sit close together. It isn't enough when shop rates differ by 30% or more for the same part, depending on how loaded the shop is, what machines it runs and how far it is from you. Five gives you a real spread and a fallback if the cheapest shop's lead time doesn't work.
More than five stops helping. You end up reading quotes instead of deciding. So we contact more shops than that behind the scenes, drop the ones that can't actually run the process, and send you the five worth comparing.
What we don't do
Being clear about this matters more with manufacturing than with anything else:
- We don't take the order. You place it with the shop directly, on your own PO.
- We don't hold your money. Advances and payments go between you and the shop.
- We make nothing on the price of the part. We don't add a margin, so we have no reason to push you towards the dearer quote.
- We don't run the shop floor or inspect the parts. We check that a shop can genuinely run the process before it quotes. Quality on the day is between you and them. Order a first-article sample before a big run.
What we do is find the shops, check them, get the quotes into a form you can compare, and introduce you.
If you run a job-work shop
When you join as a supplier, there's now a Job work you take on section. Tick the processes you actually run, and we'll send you drawings that match your machines, not ones you'd have to turn away. Join as a supplier. It's free.
Try it
Get it made: describe the part, attach the drawing, and you'll usually hear back within 48 hours. Free to post, no account needed. More on how it works on the manufacturing on demand page.